首页  软件  游戏  图书  电影  电视剧

请输入您要查询的图书:

 

图书 深埋长隧洞TBM施工组织设计关键技术(英文版)
内容
内容推荐
This book systematically discusses some key technical problems in TBM construction planning of deep buried long tunnels. It not only shares the experience of practical work, but also introduces some new technologies and new achievements, to provide valuable information for readers.The book is divided into 13 chapters, including the layout of adits,TBM lectotype,configuration, assembly and departure, advancing,transportation, ventilation, cooling, drainage, power supply, precast concrete segment, solutions in unfavorable geological tunnel section and construction schedule for TBM construction.This book can be used as a reference for engineers and technicians in the field of underground engineering construction.
目录
Translator′s Preface
Preface
Chapter 1 Layout and construction of TBM adit
1.1 Layout of TBM adit
1.2 Construction method of TBM adit
Chapter 2 TBM type selection
2.1 TBM types
2.2 Advantages and disadvantages of various types of TBM
2.3 TBM host selection principle
2.4 TBM host selection
2.5 Introduction of TBM under development
Chapter 3 TBM configuration
3.1 Open TBM configuration
3.2 Single shield TBM configuration
3.3 Double shield TBM configuration
3.4 DSU-C
Chapter 4 TBM assembly, stepping sliding and launching
4.1 TBM assembly
4.2 Concept of TBM
stepping and sliding
4.3 TBM launching
Chapter 5 TBM construction of deep buried long tunnel
5.1 Tunnel TBM
construction
5.2 Construction section of TBM through drilling and blasting method
5.3 Maintenance and disassembly of TBM
Chapter 6 TBM construction and transportation
6.1 TBM construction transportation object
6.2 Tunnel slag
transportation
6.3 Material transportation
6.4 Train formation
6.5 Locomotive configuration
Chapter 7Ventilation
7.1 Ventilation standard
7.2 Construction ventilation equipment
7.3 Calculation parameters and
formulas of construction ventilation
7.4 Construction ventilation calculation
Chapter 8 Cooling
8.1 Ambient
temperature in tunnel
8.2 Main heat sources for TBM construction of deep buried long tunnels
8.3 Calculation of heat
in the tunnel
8.4 Cooling measures in tunnel
8.5 Cooling calculation model for TBM construction of deep buried long
tunnel
Chapter 9 Drainage
9.1 Discharge forecast
9.2 Design of TBM construction drainage system
Water hammer calculation
9.4 Avoidance of water hammer
Chapter 10 Power supply
10.1 Main power load
10.2 Voltage
10.3 Construction power supply load estimation
Chapter 11 Construction management of precast
concrete segment
11.1 Scale of precast concrete segment plant
11.2 Production process of precast concrete
segment
11.3 Layout of precast concrete segment plant
Chapter 12 Countermeasures of TBM construction in unfavorable geologicalsection
12.1 Main geological risks of deep buried long tunnels
12.2 Measures to deal with main
geological risks of deep buried long tunnels
12.3 Stuck treatment measures
Chapter 13 Schedule of TBM construction
13.1 Scheduling principles
13.2 TBM drilling feeler
13.3 Other progress indicators
13.4 TBM construction schedule preparation 197Reference
标签
缩略图
书名 深埋长隧洞TBM施工组织设计关键技术(英文版)
副书名
原作名
作者 洪松//孙宝升
译者 译者:郝玉鹏//高文强//张淑鹏//孙传军
编者
绘者
出版社 黄河水利出版社
商品编码(ISBN) 9787550931848
开本 16开
页数 200
版次 1
装订 平装
字数 405
出版时间 2021-12-01
首版时间 2021-12-01
印刷时间 2021-12-01
正文语种
读者对象 普通大众
适用范围
发行范围 公开发行
发行模式 实体书
首发网站
连载网址
图书大类 科学技术-建筑-水利水电
图书小类
重量 378
CIP核字 2021256453
中图分类号 TV554
丛书名
印张 13
印次 1
出版地 河南
260
186
10
整理
媒质
用纸
是否注音
影印版本
出版商国别
是否套装
著作权合同登记号
版权提供者
定价
印数 1000
出品方
作品荣誉
主角
配角
其他角色
一句话简介
立意
作品视角
所属系列
文章进度
内容简介
作者简介
目录
文摘
安全警示 适度休息有益身心健康,请勿长期沉迷于阅读小说。
随便看

 

兰台网图书档案馆全面收录古今中外各种图书,详细介绍图书的基本信息及目录、摘要等图书资料。

 

Copyright © 2004-2025 xlantai.com All Rights Reserved
更新时间:2025/5/13 9:11:19