图书 | 深埋长隧洞TBM施工组织设计关键技术(英文版) |
内容 | 内容推荐 This book systematically discusses some key technical problems in TBM construction planning of deep buried long tunnels. It not only shares the experience of practical work, but also introduces some new technologies and new achievements, to provide valuable information for readers.The book is divided into 13 chapters, including the layout of adits,TBM lectotype,configuration, assembly and departure, advancing,transportation, ventilation, cooling, drainage, power supply, precast concrete segment, solutions in unfavorable geological tunnel section and construction schedule for TBM construction.This book can be used as a reference for engineers and technicians in the field of underground engineering construction. 目录 Translator′s Preface Preface Chapter 1 Layout and construction of TBM adit 1.1 Layout of TBM adit 1.2 Construction method of TBM adit Chapter 2 TBM type selection 2.1 TBM types 2.2 Advantages and disadvantages of various types of TBM 2.3 TBM host selection principle 2.4 TBM host selection 2.5 Introduction of TBM under development Chapter 3 TBM configuration 3.1 Open TBM configuration 3.2 Single shield TBM configuration 3.3 Double shield TBM configuration 3.4 DSU-C Chapter 4 TBM assembly, stepping sliding and launching 4.1 TBM assembly 4.2 Concept of TBM stepping and sliding 4.3 TBM launching Chapter 5 TBM construction of deep buried long tunnel 5.1 Tunnel TBM construction 5.2 Construction section of TBM through drilling and blasting method 5.3 Maintenance and disassembly of TBM Chapter 6 TBM construction and transportation 6.1 TBM construction transportation object 6.2 Tunnel slag transportation 6.3 Material transportation 6.4 Train formation 6.5 Locomotive configuration Chapter 7Ventilation 7.1 Ventilation standard 7.2 Construction ventilation equipment 7.3 Calculation parameters and formulas of construction ventilation 7.4 Construction ventilation calculation Chapter 8 Cooling 8.1 Ambient temperature in tunnel 8.2 Main heat sources for TBM construction of deep buried long tunnels 8.3 Calculation of heat in the tunnel 8.4 Cooling measures in tunnel 8.5 Cooling calculation model for TBM construction of deep buried long tunnel Chapter 9 Drainage 9.1 Discharge forecast 9.2 Design of TBM construction drainage system Water hammer calculation 9.4 Avoidance of water hammer Chapter 10 Power supply 10.1 Main power load 10.2 Voltage 10.3 Construction power supply load estimation Chapter 11 Construction management of precast concrete segment 11.1 Scale of precast concrete segment plant 11.2 Production process of precast concrete segment 11.3 Layout of precast concrete segment plant Chapter 12 Countermeasures of TBM construction in unfavorable geologicalsection 12.1 Main geological risks of deep buried long tunnels 12.2 Measures to deal with main geological risks of deep buried long tunnels 12.3 Stuck treatment measures Chapter 13 Schedule of TBM construction 13.1 Scheduling principles 13.2 TBM drilling feeler 13.3 Other progress indicators 13.4 TBM construction schedule preparation 197Reference |
标签 | |
缩略图 | ![]() |
书名 | 深埋长隧洞TBM施工组织设计关键技术(英文版) |
副书名 | |
原作名 | |
作者 | 洪松//孙宝升 |
译者 | 译者:郝玉鹏//高文强//张淑鹏//孙传军 |
编者 | |
绘者 | |
出版社 | 黄河水利出版社 |
商品编码(ISBN) | 9787550931848 |
开本 | 16开 |
页数 | 200 |
版次 | 1 |
装订 | 平装 |
字数 | 405 |
出版时间 | 2021-12-01 |
首版时间 | 2021-12-01 |
印刷时间 | 2021-12-01 |
正文语种 | 英 |
读者对象 | 普通大众 |
适用范围 | |
发行范围 | 公开发行 |
发行模式 | 实体书 |
首发网站 | |
连载网址 | |
图书大类 | 科学技术-建筑-水利水电 |
图书小类 | |
重量 | 378 |
CIP核字 | 2021256453 |
中图分类号 | TV554 |
丛书名 | |
印张 | 13 |
印次 | 1 |
出版地 | 河南 |
长 | 260 |
宽 | 186 |
高 | 10 |
整理 | |
媒质 | |
用纸 | |
是否注音 | |
影印版本 | |
出版商国别 | |
是否套装 | |
著作权合同登记号 | |
版权提供者 | |
定价 | |
印数 | 1000 |
出品方 | |
作品荣誉 | |
主角 | |
配角 | |
其他角色 | |
一句话简介 | |
立意 | |
作品视角 | |
所属系列 | |
文章进度 | |
内容简介 | |
作者简介 | |
目录 | |
文摘 | |
安全警示 | 适度休息有益身心健康,请勿长期沉迷于阅读小说。 |
随便看 |
|
兰台网图书档案馆全面收录古今中外各种图书,详细介绍图书的基本信息及目录、摘要等图书资料。