图书 石油测井工程技术中的标准操作程序(英文)/自然科学技术专著丛书
内容
内容推荐
This book aims to teach the Petroleum logging employees the standard operating procedure (SOP) in Petroleum Logging Engineering Technology. The book is divided into eleven chapters. The eleven chapters named, respectively, Openhole Wireline Logging SOP, Pipe conveyed logging SOP, Fishing Operation SOP, Vertical Seismic Profile SOP, Free Point Indicator SOP, Bridge Plug Setting SOP' Truck Preventive Maintenance 1 SOP' Truck Preventive Maintenance 2 SOP, Truck Preventive Maintenance 3 SOP, Wireline Converyed Perforating SOP and Tubing Conveyed Perforating SOE
This book narrates the standard operating procedure (SOP) from the whole process of petroleum logging engineering in detail. It can be used as a guidance book in petroleum logging employees' work and would improve their operation standardization and security.
This book also should attract the attention of the managers in petroleum Logging industry, both domestic and abroad. They could supervise their employees whether operate in a standard procedure and teach them what the correct procedure is.
What's more, this book also could be used for the students, who prepare to engage in the industry work, as a self-study book in Petroleum University.
作者简介
夏学锋,博士、高级工程师,石油勘探测井技术专家,从事石油勘探行业近二十年,先后在哈萨克斯坦、阿塞拜疆、阿联酋、阿曼等国家工作,具有丰富的现场施工和管理工作经验,先后参与了“海洋石油工程装备大数据”国家工程实验室建设、国家自然科学基金项目、中国科技项目管理专业委员会建设,获得十余项石油石化行业科学技术进步奖及管理创新成果奖,参与编写了石油工业出版社出版的测井专业技术论文集、中国商务出版社出版的人力资源管理实务,被列为高等教育“十三五”规划教材,在国外电子测量技术、中国石油石化等期刊发表专业学术论文二十余篇。
目录
Chapter 1 Openhole Wireline Logging SOP
1.1 Preparation at Bace
1.2 Mobilization
1.3 Preparation at Wellsite
1.4 Logging Operations
1.5 Post]obWellsite Procedure
1.6 Demobilization
Chapter 2 Pipe Conveyed Logging SOP
2.1 Preparation at Base
2.2 Mobilization
2.3 Preparation at Wellsite
2.4 Operations
2.5 Post lob Wellsite Procedure
2.6 Demobilization
Chapter 3 Fishing Operation SOP
3.1 Preparation at Base
3.2 Mobilization
3.3 Preparation at Wellsite
3.4 Operations
3.5 Post]ob Wellsite Procedure
3.6 Demobilization
Chapter 4 Vertical Seismic Profile SOP
4.1 Preparation at Base
4.2 Mobilization
4.3 Preparation atWellsite
4.4 Operations
4.5 Post Job Wellsite Procedure
4.6 Demobilization
Chapter 5 Free Point Indicator SOP
5.1 Preparation at Base
5.2 Mobilization
5.3 Preparation atWellsite
5.4 Operations
5.5 Post Job Wellsite Procedure
5.6 Demobilization
Chapter 6 Bridge Plug Setting SOP
6.1 Preparation at Base
6.2 Mobilization
6.3 Preparation atWellsite
6.4 Operations
6.5 Post Job Wellsite Procedure
6.6 Demobilization
Chapter 7 Truck Preventive Maintenance 1 SOP
7.1 Preliminary Inspection
7.2 Inspection Front of Cab
7.3 Inspection Left Side of Cab
7.4 Inspection Lower Left Side of Recorder Cab
7.5 Inspection Left Side Tandem Wheels Area
7.6 Inspection Right Side Tandem Wheels Area
7.7 Inspection Right Side of Cab
7.8 Inspection Under the Vehicle
7.9 Inspection Under the Cab Cover
7.10 Inspection Insidethe Cab
7.11 Inspection Lighting
7.12 Trouble Shooting
Chapter 8 Truck Preventive Maintenance 2 SOP
8.1 Driving Inspection
8.2 Stationary Inspection
8.3 Engine Compartment Inspection
8.4 Tire And Wheel Inspection
8.5 Battery Inspection
8.6 Under Vehicle Inspection
8.7 Body Inspection
8.8 Air Conditioner Inspection
8.9 Safety Equipment Inspection
8.10 Air Cleaner Inspection
8.11 Fuel System Inspection
8.12 Auxiliary Generator Inspection
8.13 Hydraulic Inspection
8.14 Generator Inspection
Chapter 9 Truck Preventive Maintenance 3 SOP
9.1 Driving Inspection
9.2 Stationary Inspection
9.3 Engine Compartment Inspection
9.4 Tire And Wheel Inspection
9.5 Battery Inspection
9.6 Under Vehicle Inspection
9.7 Body Inspection
9.8 Air Conditioner Inspection
9.9 Safety Equipment Inspection
9.10 Air Cleaner Inspection
9.11 Raise Front End Inspection
9.12 Lubrication Inspection
9.13 Fuel System Inspection
9.14 Auxiliary Generator Inspection
9.15 Hydraulic Inspection
9.16 AT-355/aubum Transmission Inspection
9.17 Draw Works
9.18 Generator Inspection
Chapter 10 Wireline Conveyed Perforating SOP
10.1 Preparation at Base
10.2 Mobilization
10.3 Preparation at Wellsite
10.4 Operations
10.5 Post Job Wellsite Procedure
10.6 Demobilization
Chapter 11 Tubing Conveyed Perforating SOP
11.1 Preparation at Base
11.2 Mobilization
11.3 Preparation at Wellsite
11.4 Operations
11.5 Post Job Wellsite Procedure
11.6 Demobilization
Appendix 1 Depth Control Policy
Appendix 2 CNLC Fishing Policy
Appendix 3 Prevention of Sticking
Appendix 4 Quick Splice Instructions
Appendix 5 Square Knot (Reef Knot)
Appendix 6 Reverse Cut and Thread
Appendix 7 Crane Operation
Appendix 8 Wellhead Voltage Levels
Appendix 9 Radio Silence
Appendix 10 Power Shutdown
Appendix 11 TCP String
Appendix 12 Torque for Threaded Connections
标签
缩略图
书名 石油测井工程技术中的标准操作程序(英文)/自然科学技术专著丛书
副书名
原作名
作者 夏学锋//孙中原
译者
编者
绘者
出版社 北京邮电大学出版社
商品编码(ISBN) 9787563551323
开本 16开
页数 355
版次 1
装订 平装
字数 626
出版时间 2018-02-01
首版时间 2018-02-01
印刷时间 2018-02-01
正文语种
读者对象 普通大众
适用范围
发行范围 公开发行
发行模式 实体书
首发网站
连载网址
图书大类 科学技术-工业科技-能源
图书小类
重量 664
CIP核字 2017319598
中图分类号 TE151-65
丛书名
印张 23
印次 1
出版地 北京
261
186
17
整理
媒质
用纸
是否注音
影印版本
出版商国别 CN
是否套装
著作权合同登记号
版权提供者
定价
印数
出品方
作品荣誉
主角
配角
其他角色
一句话简介
立意
作品视角
所属系列
文章进度
内容简介
作者简介
目录
文摘
安全警示 适度休息有益身心健康,请勿长期沉迷于阅读小说。
随便看

 

兰台网图书档案馆全面收录古今中外各种图书,详细介绍图书的基本信息及目录、摘要等图书资料。

 

Copyright © 2004-2025 xlantai.com All Rights Reserved
更新时间:2025/5/9 17:28:55